Substrate: Modified Granulated Cap Sheet and Spray Polyurethane Foam
Solution: 20YR Acrylic restoration system with Silicone in waterways
Before images of existing substrate
Basecoat and polyester installed
First pass of topcoat installed at SPF roof section
Granules meet topcoat at parapet wall
Comentários